JLG 943 Telehandler Parts Manual
1,272 pages · Publication 31211371
Added to your cart. View cart
- Models
- 943
- Manual type
- Parts Manual
- Pages
- 1,272
- Publication
- 31211371
- Condition
- Brand new

What's inside
From the manual's own table of contents: 234 sections, 537 entries. See sample pages (PDF, 574 KB)
General54 topics
- SECTION 1 - FRAME AND ATTACHING PARTS
- FIGURE 1-1. ENGINE ENCLOSURE INSTALLATION
- FIGURE 1-2. ENGINE ENCLOSURE COVER INSTALLATION
- FIGURE 1-3. HOOD ASSEMBLY
- FIGURE 1-4. COVER INSTALLATION (NO OUTRIGGERS) (ULS) (PVC 1911)
- FIGURE 1-5. COVER INSTALLATION (NO OUTRIGGERS) (ULS) (PVC 2005)
- FIGURE 1-6. COVER INSTALLATION (NO OUTRIGGERS) (LS) (PVC 1911)
- FIGURE 1-7. COVER INSTALLATION (NO OUTRIGGERS) (LS) (PVC 2005)
- FIGURE 1-8. TANK INSTALLATION
- FIGURE 1-9. FUEL TANK INSTALLATION
- FIGURE 1-10. HYDRAULIC TANK INSTALLATION
- FIGURE 1-11. FUEL CAP ASSEMBLY
- FIGURE 1-12. MIRROR INSTALLATION
- FIGURE 1-13. BOOM PROP INSTALLATION (ANSI)
- FIGURE 1-14. BOOM PROP INSTALLATION (CANADA)
- FIGURE 1-15. BOOM PROP BRACKET
- SECTION 2 - BOOM
- FIGURE 2-1. BOOM ASSEMBLY
- FIGURE 2-2. FIRST BOOM SECTION ASSEMBLY
- FIGURE 2-3. SECOND BOOM SECTION ASSEMBLY
- FIGURE 2-4. THIRD BOOM SECTION ASSEMBLY
- FIGURE 2-5. RETRACT CHAIN INSTALLATION
- FIGURE 2-6. EXTEND CHAIN INSTALLATION
- FIGURE 2-7. PINS INSTALLATION
- FIGURE 2-8. RETRACT CHAIN SHEAVE
- FIGURE 2-9. EXTEND CHAIN ROLLER
- FIGURE 2-10. HOSE BRACKET INSTALLATION
- FIGURE 2-11. BOOM PINNING INSTALLATION
- FIGURE 2-12. LIFT CYLINDER PINS INSTALLATION
- FIGURE 2-13. COMPENSATION CYLINDER PINS INSTALLATION
- FIGURE 2-14. BOOM PIVOT PIN INSTALLATION
- FIGURE 2-15. MANUAL QUICK COUPLER INSTALLATION
- FIGURE 2-16. HYDRAULIC QUICK COUPLER INSTALLATION
- FIGURE 2-17. BOOM PIN INSTALLATION
- FIGURE 2-18. TILT CYLINDER PIN INSTALLATION
- FIGURE 2-19. BOOM ANGLE INDICATOR INSTALLATION
- FIGURE 2-20. BOOM BRUSHES INSTALLATION
- FIGURE 2-21. QUICK SWITCH COUPLING ASSEMBLY (MANUAL)
- SECTION 3 - ATTACHMENTS
- FIGURE 3-1. BASKET, PERSONNEL - 4FT X 8FT (ASME)
- FIGURE 3-2. BASKET, PERSONNEL - 4FT X 8FT (DOMESTIC)
- FIGURE 3-3. BASKET, PERSONNEL - 4FT X 8FT (ISO)
- FIGURE 3-4. BASKET, FORK MOUNTED
- FIGURE 3-5. BOOM - ADJUSTABLE (CARRIAGE MOUNTED) (PVC 1911)
- FIGURE 3-6. BOOM - ADJUSTABLE (CARRIAGE MOUNTED) (PVC 2005)
- FIGURE 3-7. BOOM - ADJUSTABLE (FORK MOUNTED)
- FIGURE 3-8. BOOM - 3FT WITH WINCH
- FIGURE 3-9. BOOM - 12FT WITHOUT WINCH (PVC 1911)
- FIGURE 3-10. BOOM - 12FT WITHOUT WINCH (PVC 2005)
- FIGURE 3-11. BOOM - 12FT WITH WINCH
- FIGURE 3-12. BOOM - 15FT WITHOUT WINCH (PVC 1911)
- FIGURE 3-13. BOOM - 15FT WITHOUT WINCH (PVC 2005)
- FIGURE 3-19. BUCKET - 96IN GRAPPLE
- FIGURE 3-21. CARRIAGE ASSEMBLY - 48IN/12000# CAPICITY SIDE SHIFT
Show all 235 sections
FIGURE 4-9. ENGINE PARTS INSTALLATION (HEATER)63 topics
- FIGURE 4-10. AIR CLEANER INSTALLATION (ULS)
- FIGURE 4-11. AIR CLEANER INSTALLATION (LS)
- FIGURE 4-12. AIR CLEANER ASSEMBLY, 74HP
- FIGURE 4-13. AIR CLEANER ASSEMBLY, 110HP
- FIGURE 4-14. AIR INTAKE DUCT INSTALLATION
- FIGURE 4-15. AIR CLEANER LINES INSTALLATION (ULS)
- FIGURE 4-16. AIR CLEANER LINES INSTALLATION (LS)
- FIGURE 4-17. AIR INTAKE SHUT OFF VALVE INSTALLATION
- FIGURE 4-20. EXHAUST INSTALLATION, 74HP (ULS)
- FIGURE 4-21. EXHAUST INSTALLATION, 110HP (ULS)
- FIGURE 4-22. EXHAUST INSTALLATION, 110HP (LS)
- FIGURE 4-23. MUFFLER INSTALLATION (LS)
- FIGURE 4-24. DEF TANK INSTALLATION
- FIGURE 4-25. DEF TANK ASSEMBLY
- FIGURE 4-26. DEF BREATHER VALVE
- FIGURE 4-27. DEF PUMP AND CONTROL INSTALLATION
- FIGURE 4-28. UREA PUMP
- FIGURE 4-29. DEF PUMP LINES INSTALLATION
- FIGURE 4-30. DEF LINES INSTALLATION
- FIGURE 4-31. FUEL LINES INSTALLATION (ULS)
- FIGURE 4-32. FUEL LINES INSTALLATION (LS)
- FIGURE 4-33. PRIMARY FUEL FILTER INSTALLATION (ULS)
- FIGURE 4-34. PRIMARY FUEL FILTER INSTALLATION (LS)
- FIGURE 4-35. FUEL TANK ASSEMBLY
- FIGURE 4-36. FAN INSTALLATION, 74HP (ULS)
- FIGURE 4-37. FAN INSTALLATION, 110HP
- FIGURE 4-38. FAN GUARD INSTALLATION
- FIGURE 4-39. COOLING PACKAGE INSTALLATION (ULS)
- FIGURE 4-40. COOLING PACKAGE INSTALLATION (LS)
- FIGURE 4-41. COOLANT LINES INSTALLATION (ULS)
- FIGURE 4-42. COOLANT LINES INSTALLATION (LS)
- FIGURE 4-43. RADIATOR COOLING PACKAGE
- FIGURE 4-44. SURGE TANK INSTALLATION
- FIGURE 4-45. A/C PUMP INSTALLATION (ULS)
- FIGURE 4-46. A/C PUMP INSTALLATION (LS)
- FIGURE 4-47. A/C LINES INSTALLATION
- FIGURE 4-48. CAC LINES INSTALLATION (ULS)
- FIGURE 4-49. CAC LINES INSTALLATION (LS)
- FIGURE 4-50. HOC LINES INSTALLATION
- FIGURE 4-51. TOC LINES INSTALLATION
- SECTION 5 - DRIVE TRAIN
- FIGURE 5-1. TRANSMISSION INSTALLATION, 74 HP
- FIGURE 5-2. TRANSMISSION INSTALLATION, 110 HP
- FIGURE 5-3. POWERSHIFT TRANSMISSION
- FIGURE 5-4. TRANSMISION, ENGINE CONNECTION
- FIGURE 5-5. TRANSMISSION, CONVERTER
- FIGURE 5-6. TRANSMISSION, INPUT
- FIGURE 5-7. TRANSMISSION, HOUSING GROUP 1
- FIGURE 5-8. TRANSMISSION, HOUSING GROUP 2
- FIGURE 5-9. TRANSMISSION, CLUTCH GROUP 1
- FIGURE 5-10. TRANSMISSION, CLUTCH GROUP 2
- FIGURE 5-11. TRANSMISSION, COUPLING GROUP 1
- FIGURE 5-12. TRANSMISSION, COUPLING GROUP 2
- FIGURE 5-13. TRANSMISSION, COUPLING GROUP 3
- FIGURE 5-14. TRANSMISSION, COUPLING GROUP 4
- FIGURE 5-15. TRANSMISSION, OUTPUT
- FIGURE 5-16. TRANSMISSION, POWER TAKE-OFF
- FIGURE 5-17. TRANSMISSION, CONTROL UNIT
- FIGURE 5-18. TRANSMISSION, SHIFT SYSTEM
- FIGURE 5-19. TRANSMISSION, PRESSURE REGULATOR
- FIGURE 5-20. TRANSMISSION, PRESSURE OIL PUMP
- FIGURE 5-21. TRANSMISSION, INDUCTIVE TRANSMITTER
- FIGURE 5-22. TRANSMISSION, FILTER
FIGURE 5-89. REAR AXLE, 110HP- PLANET GEAR CARRIER (PVC 1911)57 topics
- FIGURE 5-90. REAR AXLE, 110HP- PLANET GEAR CARRIER (PVC 1911)
- FIGURE 5-92. REAR AXLE, 110HP - RING GEAR SUPPORT (PVC 1911)
- FIGURE 5-95. REAR AXLE, 110HP - CENTRAL HOUSING (PVC 2005)
- FIGURE 5-96. REAR AXLE, 110HP – DIFFERENTIAL (PVC 2005)
- FIGURE 5-97. REAR AXLE, 110HP - HUB REDUCTION (PVC 2005)
- FIGURE 5-100. REAR AXLE, 110HP - DIFFERENTIAL KIT (PVC 2005)
- FIGURE 5-101. REAR AXLE, 110HP- PLANET GEAR CARRIER (PVC 2005)
- FIGURE 5-102. REAR AXLE, 110HP- PLANET GEAR CARRIER (PVC 2005)
- FIGURE 5-104. REAR AXLE, 110HP - RING GEAR SUPPORT (PVC 2005)
- FIGURE 5-105. LSI AXLE SENSOR INSTALLATION
- FIGURE 5-106. TIRE/WHEEL SET 370/75-28 PNEUMATIC
- FIGURE 5-107. TIRE/WHEEL SET 370/75-28 PNEUMATIC NON-MARKING
- FIGURE 5-108. TIRE/WHEEL SET 370/75-28 FOAM-FILLED
- FIGURE 5-109. TIRE/WHEEL SET 370/75-28 FOAM-FILLED NON-MARKING
- FIGURE 5-110. TIRE/WHEEL SET 14-24 16PR - PNEUMATIC
- FIGURE 5-111. TIRE/WHEEL SET 14-24 12PR - FOAM-FILLED
- FIGURE 5-114. FENDER INSTALLATION
- FIGURE 5-115. WHEEL CHOCK INSTALLATION
- FIGURE 5-116. TOOLBOX INSTALLATION
- SECTION 6 - CAB
- FIGURE 6-1. CAB MOUNTING
- FIGURE 6-2. CAB MOUNTS INSTALLATION
- FIGURE 6-3. FRONT CAB OUTRIGGER INSTALLATION
- FIGURE 6-4. CAB FENDER INSTALLATION
- FIGURE 6-5. CAB FENDER INSTALLATION REAR (LH)
- FIGURE 6-6. OROPS CAB INSTALLATION
- FIGURE 6-7. EROPS CAB INSTALLATION
- FIGURE 6-8. CAB, TRIM KIT
- FIGURE 6-9. CAB, TRIM KIT
- FIGURE 6-10. OPEN CAB ASSEMBLY (PVC 1911)
- FIGURE 6-11. OPEN CAB ASSEMBLY (PVC 2005)
- FIGURE 6-12. OPEN CAB, LSI INSTALLATION
- FIGURE 6-13. OPEN CAB PLUG GROUP
- FIGURE 6-14. CAB, EPD CAULK
- FIGURE 6-15. ENCLOSED CAB ASSEMBLY (PVC 1911)
- FIGURE 6-16. ENCLOSED CAB ASSEMBLY (PVC 2005)
- FIGURE 6-17. ENCLOSED CAB, LSI INSTALLATION
- FIGURE 6-18. REAR WINDOW INSTALLATION
- FIGURE 6-19. REAR WINDOW INSTALLATION (WO/WIPER) (ANSI)
- FIGURE 6-20. REAR WINDOW INSTALLATION (WO/WIPER) (ISO)
- FIGURE 6-21. REAR WINDOW INSTALLATION (WO/WIPER) (ENG/SPAN)
- FIGURE 6-22. REAR WINDOW ASSEMBLY
- FIGURE 6-23. DOOR INSTALLATION
- FIGURE 6-24. DOOR UPPER GLASS ASSEMBLY
- FIGURE 6-25. CAB LATCH ASSEMBLY
- FIGURE 6-26. CAB DOOR TRIGGER ASSEMBLY
- FIGURE 6-27. DOOR ASSEMBLY
- FIGURE 6-28. CAB DOOR
- FIGURE 6-29. DOOR STRAP INSTALLATION
- FIGURE 6-30. ENCLOSED CAB PLUG GROUP
- FIGURE 6-31. LSI DISPLAY INSTALLATION (OPEN CAB) (PVC 1911)
- FIGURE 6-32. LSI DISPLAY INSTALLATION (OPEN CAB) (PVC 2005)
- FIGURE 6-33. LSI DISPLAY INSTALLATION (ENCLOSED CAB)
- FIGURE 6-34. BASIC MIRROR INSTALLATION
- FIGURE 6-35. FRONT COVER INSTALLATION
- FIGURE 6-36. FIRE EXTINGUISHER INSTALLATION
- FIGURE 6-37. FILTER TRAY PANEL
FIGURE 8-5. BOOM HYDRAULIC INSTALLATION65 topics
- FIGURE 8-6. BOOM AUXILIARY HYDRAULICS INSTALLATION
- FIGURE 8-7. BOOM AUXILIARY HYDRAULICS (HYDRAULIC COUPLER)
- FIGURE 8-8. BOOM AUXILIARY VALVE & FITTINGS ASSEMBLY (HYDRAULIC COUPLER)
- FIGURE 8-9. BOOM HYDRAULIC TUBES INSTALLATION
- FIGURE 8-10. CAB HYDRAULIC INSTALLATION (PVC 1911)
- FIGURE 8-11. CAB HYDRAULIC INSTALLATION (PVC 2005)
- FIGURE 8-12. CAB HYDRAULICS INSTALLATION (EMERGENCY STEERING) (PVC 1911)
- FIGURE 8-13. CAB HYDRAULICS INSTALLATION (EMERGENCY STEERING) (PVC 2005)
- FIGURE 8-14. COUNTERBALANCE VALVE INSTALLATION (LIFT - PGLS NO RIDE CONTROL)
- FIGURE 8-15. COUNTERBALANCE VALVE HYDRAULIC LINES (LIFT - RIDE CONTROL)
- FIGURE 8-16. COUNTERBALANCE VALVE HYDRAULIC LINES (LIFT - RIDE CONTROL)
- FIGURE 8-17. EMERGENCY STEERING MANIFOLD & FITTINGS ASSEMBLY
- FIGURE 8-18. FRAME HYDRAULICS INSTALLATION (PVC 1911)
- FIGURE 8-19. FRAME HYDRAULICS INSTALLATION (PVC 2005)
- FIGURE 8-20. FRAME LEVEL INSTALLATION
- FIGURE 8-21. FRAME LEVEL HYDRAULICS INSTALLATION (NO OUTRIGGERS) (PVC 1911)
- FIGURE 8-22. FRAME LEVEL HYDRAULICS INSTALLATION (NO OUTRIGGERS) (PVC 2005)
- FIGURE 8-23. PISTON PUMP INSTALLATION
- FIGURE 8-24. PISTON PUMP ASSEMBLY (PVC 1911)
- FIGURE 8-25. PISTON PUMP ASSEMBLY (PVC 2005)
- FIGURE 8-26. REAR AXLE STABILIZER INSTALLATION (PVC 1911)
- FIGURE 8-27. REAR AXLE STABILIZER INSTALLATION (PVC 2005)
- FIGURE 8-28. VALVE INSTALLATION
- FIGURE 8-29. VALVE INSTALLATION - FRAME LEVEL AND STEERING SELECT
- FIGURE 8-30. VALVE & FITTINGS ASSEMBLY- FRAME LEVEL
- FIGURE 8-31. VALVES INSTALLATION - MAIN & PRIORITY (PVC 1911)
- FIGURE 8-32. VALVES INSTALLATION - MAIN & PRIORITY (PVC 2005)
- FIGURE 8-33. VALVE INSTALLATION - MAIN
- FIGURE 8-34. VALVE & FITTINGS ASSEMBLY- MAIN
- FIGURE 8-35. VALVE INSTALLATION – PRIORITY (PVC 1911)
- FIGURE 8-36. VALVE INSTALLATION – PRIORITY (PVC 2005)
- FIGURE 8-37. VALVE ASSEMBLY - PRIORITY FUNCTION MANIFOLD (PVC 1911)
- FIGURE 8-38. VALVE ASSEMBLY - PRIORITY FUNCTION MANIFOLD (PVC 2005)
- FIGURE 8-39. VALVE INSTALLATION - SAHR BRAKE (PVC 2005)
- FIGURE 8-40. VALVE ASSEMBLY - SAHR BRAKE (PVC 2005)
- FIGURE 8-41. VALVES MOUNTING INSTALLATION - STEER SELECT
- FIGURE 8-42. VALVE INSTALLATION - STEER SELECT
- FIGURE 8-43. VALVE & FITTINGS ASSEMBLY- STEER SELECT
- FIGURE 8-44. VALVE ASSEMBLY - GLS (NO RIDE CONTROL)
- SECTION 9 - HYDRAULIC COMPONENTS
- FIGURE 9-1. COUPLER - HYDRAULIC COUPLER
- FIGURE 9-2. CYLINDER GROUP INSTALLATION
- FIGURE 9-3. CYLINDER ASSEMBLY - CARRIAGE SIDE TILT
- FIGURE 9-4. CYLINDER ASSEMBLY - CARRIAGE SWING
- FIGURE 9-5. CYLINDER ASSEMBLY - COMPENSATION
- FIGURE 9-6. CYLINDER SUB-ASSEMBLY - EXTEND/RETRACT
- FIGURE 9-7. CYLINDER ASSEMBLY - EXTEND/RETRACT
- FIGURE 9-8. CYLINDER ASSEMBLY - FORK POSITIONING
- FIGURE 9-9. CYLINDER INSTALLATION - FRAME LEVEL (PVC 1911)
- FIGURE 9-10. CYLINDER INSTALLATION - FRAME LEVEL (PVC 2005)
- FIGURE 9-11. CYLINDER ASSEMBLY - FRAME LEVEL
- FIGURE 9-12. CYLINDER ASSEMBLY - GRAPPLE BUCKET
- FIGURE 9-13. LIFT CYLINDER
- FIGURE 9-14. CYLINDER SUB-ASSEMBLY - QUICK COUPLER
- FIGURE 9-15. CYLINDER ASSEMBLY - QUICK COUPLER
- FIGURE 9-16. CYLINDER INSTALLATION - REAR AXLE STABILIZER
- FIGURE 9-17. CYLINDER ASSEMBLY - STABILIZER (REAR AXLE)
- FIGURE 9-18. CYLINDER SUB-ASSEMBLY - TILT
- FIGURE 9-19. CYLINDER ASSEMBLY - TILT
- FIGURE 9-20. PUMP ASSEMBLY - PISTON
- FIGURE 9-21. TANK HYDRAULIC
- FIGURE 9-22. AIR SHUT OFF VALVE
- FIGURE 9-23. VALVE & FITTINGS - CARRIAGE (DUAL FORK)
- FIGURE 9-24. VALVE - CARRIAGE DUAL FORK FLOW DIVIDER
- FIGURE 9-25. VALVE ASSEMBLY - FRAME LEVEL
FIGURE 10-55. ENGINE BAY - ELECTRICAL INSTALLATION (74HP) (ULS)64 topics
- FIGURE 10-56. ENGINE BAY - ELECTRICAL INSTALLATION (110HP) (ULS)
- FIGURE 10-57. ENGINE BAY - ELECTRICAL INSTALLATION (110HP) (LS)
- FIGURE 10-58. ENGINE BAY - WIRING INSTALLATION (74HP) (ULS)
- FIGURE 10-59. ENGINE BAY - WIRING INSTALLATION (110HP) (ULS)
- FIGURE 10-60. ENGINE BAY - WIRING INSTALLATION (110HP) (LS)
- FIGURE 10-61. ENGINE/CHASSIS HARNESS (110HP) (ULS)
- FIGURE 10-62. ENGINE - ECU INSTALLATION (ULS)
- FIGURE 10-63. ENGINE - ECU INSTALLATION (LS)
- FIGURE 10-64. ENGINE TBAP HARNESS
- FIGURE 10-65. FRAME - ELECTRICAL INSTALLATION
- FIGURE 10-66. FRAME - POWER DISTRIBUTION BOX
- FIGURE 10-67. FRAME - WIRING INSTALLATION (74HP) (ULS) (PVC 1911)
- FIGURE 10-68. FRAME - WIRING INSTALLATION (74HP) (ULS) (PVC 2005)
- FIGURE 10-69. FRAME - WIRING INSTALLATION (110HP) (ULS) (PVC 1911)
- FIGURE 10-70. FRAME - WIRING INSTALLATION (110HP) (ULS) (PVC 2005)
- FIGURE 10-71. FRAME - WIRING INSTALLATION (110HP) (LS) (PVC 1911)
- FIGURE 10-72. FRAME - WIRING INSTALLATION (110HP) (LS) (PVC 2005)
- FIGURE 10-73. FRAME HARNESS - FRONT (PVC 1911)
- FIGURE 10-74. FRAME HARNESS – FRONT (PVC 2005)
- FIGURE 10-75. FRAME HARNESS - REAR (PVC 1911)
- FIGURE 10-76. FRAME HARNESS - REAR (PVC 2005)
- FIGURE 10-77. HEATER HARNESS - CUMMINS BREATHER (74HP) (ULS)
- FIGURE 10-78. HEATER HARNESS - CUMMINS BREATHER (110HP) (ULS) (PVC 1911)
- FIGURE 10-79. HEATER HARNESS - CUMMINS BREATHER (110HP) (ULS) (PVC 2005)
- FIGURE 10-80. HEATER HARNESS - FUEL FILTER
- FIGURE 10-81. HEATER HARNESS - HYDRAULIC TANK
- FIGURE 10-82. HVAC ACTUATOR HARNESS
- FIGURE 10-83. LIGHTS - BEACON INSTALLATION (LED)
- FIGURE 10-84. LIGHTS - BOOM WORK LIGHTS SWITCH/HARNESS INSTALLATION (LED)
- FIGURE 10-85. LIGHTS - BOOM WORK LIGHTS HARNESS INSTALLATION (LED)
- FIGURE 10-86. LIGHTS - BOOM WORK LIGHTS HARNESS
- FIGURE 10-87. LIGHTS - CAB WORK LIGHTS INSTALLATION (NO A/C) (LED)
- FIGURE 10-88. LIGHTS - CAB WORK LIGHTS INSTALLATION (A/C) (LED)
- FIGURE 10-89. LIGHTS - ROADLIGHTS INSTALLATION
- FIGURE 10-90. LIGHTS - ROADLIGHTS HEADLIGHT HARNESS
- FIGURE 10-91. LIGHTS - ROADLIGHTS TAILLIGHTS HARNESS
- FIGURE 10-92. LIGHTS - SWITCH INSTALLATION
- FIGURE 10-93. LSI HARNESS - BOOM RETRACT
- FIGURE 10-94. PLATFORM HARNESS
- FIGURE 10-95. REVERSE CAMERA INSTALLATION
- FIGURE 10-96. REVERSE CAMERA INSTALLATION - NO HED
- FIGURE 10-97. REVERSE CAMERA OPTION HARNESS - NO HED
- FIGURE 10-98. REVERSE SENSOR INSTALLATION
- FIGURE 10-99. REVERSE SENSOR HARNESS
- FIGURE 10-100. RIDE CONTROL VALVE HARNESS INSTALLATION
- FIGURE 10-101. RIDE CONTROL VALVE HARNESS
- FIGURE 10-102. ROOF PIGTAIL HARNESS
- FIGURE 10-103. USB CHARGER INSTALLATION
- SECTION 11 - DECALS
- FIGURE 11-1. DECAL INSTALLATION (ANSI) (74 HP)
- FIGURE 11-2. DECAL INSTALLATION (ANSI) (110 HP)
- FIGURE 11-3. DECAL INSTALLATION (CSA ENGLISH/FRENCH) (74 HP)
- FIGURE 11-4. DECAL INSTALLATION (CSA ENGLISH/FRENCH) (110 HP)
- FIGURE 11-5. DECAL INSTALLATION (ISO) (74 HP)
- FIGURE 11-6. DECAL INSTALLATION (ISO) (110 HP)
- FIGURE 11-7. DECAL INSTALLATION (LATIN AMERICAN ENGLISH/SPANISH) (74HP)
- FIGURE 11-8. DECAL INSTALLATION (LATIN AMERICAN ENGLISH/SPANISH) (110HP)
- FIGURE 11-9. BRAND AND MODEL DECAL INSTALLATION
- FIGURE 11-10. CAPACITY CHART BOOKLET (ANSI)
- FIGURE 11-11. CAPACITY CHART BOOKLET (ISO)
- FIGURE 11-12. CAPACITY CHART HOLDER INSTALLATION
- FIGURE 11-13. CLEARSKY DECAL INSTALLATION
- FIGURE 11-14. REVERSE SENSOR SYSTEM DECAL (ENGLISH)
- FIGURE 11-15. REVERSE SENSOR SYSTEM DECAL (ENGLISH/SPANISH)
Inside this manual
Real pages from this parts manual (1,272 pages). Open the sample pages (PDF, 574 KB)
- Parts illustration, page 53: SECTION 2 - BOOM
- Parts illustration, page 167: SECTION 3 - ATTACHMENTS
- Parts illustration, page 965: SECTION 10 - ELECTRICAL
Other manuals for this machine
Save 10% on 2 manuals, 15% on 3 or more. Other manuals for the 943 are listed below. Editions cover different serial number ranges: check the serial coverage and tick only the ones that match your machine.
Added to your cart. View cart
This is a parts manual
Here's how it compares to the other manual types.
Service manual
Factory repair procedures and technical information such as specifications, troubleshooting, and wiring and hydraulic diagrams, for the models and systems the manual covers. See What's inside for its topics.
Operator's manual
Safe operation, controls, maintenance schedules, lubrication points, inspections, and basic checks. Repair procedures are in the service manual.
Parts manual
Illustrated diagrams with factory part numbers for identifying components and ordering parts. Repair procedures are in the service manual.
What it's used for
Factory manual for in-house farm and construction shop use. Straightforward, complete, and easy to follow. It contains the OEM information dealership service departments and parts counters use to diagnose problems, identify components, and perform maintenance or repairs correctly.
Service shops and owner/operators who repair their own equipment
Identifying correct parts and seeing how assemblies come apart and go back together
Keeping equipment running with less downtime
Factory manual, 1,272 pages
Quantity one is the manual described above.
Fast free USA shipping
Ships in 1 business day.
60-day returns
Free if the mistake is ours. A manual ordered in error must come back unopened in its shrink-wrap; you pay return shipping and a 20% restocking fee applies. Return policy
Binder not included
Manuals over about 300 pages may need a standard 3-ring binder, which you can buy locally to keep the pages organized for shop use.
Other editions and similar models
Questions about model, serial number, engine coverage or contents? Contact us before purchasing and we'll help confirm it's the right manual. Please verify the manual type, machine model, serial number range and engine coverage before purchasing: manuals ordered in error carry a 20% restocking fee (return policy).