Komatsu D375A-5 Bulldozer Operation & Maintenance Manual
254 pages · Publication TEN00197-03
Added to your cart. View cart
- Models
- D375A-5
- Serial coverage
- 18200 and up
- Manual type
- Operation & Maintenance Manual
- Pages
- 254
- Publication
- TEN00197-03
- Condition
- Brand new

What's inside
From the manual's own table of contents: 79 topics. See sample pages (PDF, 348 KB)
- GENERAL PRECAUTIONS
- PRECAUTIONS FOR OPERATION
- BEFORE STARTING ENGINE
- OPERATION
- TRANSPORTATION
- BATTERY
- TOWING
- PRECAUTIONS FOR MAINTENANCE
- SWITCHES
- CONTROL LEVERS, PEDALS
- DUST INDICATOR
- POWER SOURCE
- FUSE BOX
- DOOR OPEN LOCK
- SASH GLASS INTERMEDIATE LOCK
- DOOR POCKET
- ASHTRAY
- TOOL BOX
- HANDLING HEATER
- ADDITIONAL HEATER, HANDLING
- ACCUMULATOR, HANDLING
- HANDLING REVERSIBLE FAN
- HANDLING ENGINE SIDE COVER, ENGINE ROOM QUILTING
- HANDLING INSPECTION LAMP
Show all 79 topics
- EXTERNAL POWER SOURCE TYPE ENGINE PREHEATING HEATER
- HANDLING OF MACHINE- MOUNTED COMBUSTION PRE- HEATER
- HANDLING OF FUEL STRAINER HEATER
- CHECK BEFORE STARTING ENGINE, ADJUST
- STARTING ENGINE
- OPERATIONS AND CHECKS AFTER STARTING ENGINE
- STOPPING ENGINE
- CHECK AFTER STOPPING ENGINE
- MACHINE OPERATION
- STEERING MACHINE
- PARKING MACHINE
- CHECK AFTER FINISHING WORK
- LOCKING
- WORK POSSIBLE USING BULLDOZER
- METHOD OF OPERATING PIN PULLER
- ADJUSTING POSTURE OF WORK EQUIPMENT
- TIPS FOR LONGER UNDERCARRIAGE LIFE
- TRANSPORTATION PROCEDURE
- LOADING, UNLOADING WORK
- PRECAUTIONS FOR LOADING
- METHOD OF LIFTING MACHINE
- PRECAUTIONS FOR TRANSPORTATION
- TRAVELING ON ROADS
- REMOVAL OF CAB
- INSTALLATION OF CAB
- COLD WEATHER OPERATION
- PRECAUTIONS FOR LOW TEMPERATURE
- AFTER COMPLETION OF WORK
- AFTER COLD WEATHER
- LONG-TERM STORAGE
- BEFORE STORAGE
- DURING STORAGE
- AFTER STORAGE
- STARTING MACHINE AFTER LONG-TERM STORAGE
- TROUBLESHOOTING
- AFTER RUNNING OUT OF FUEL
- METHOD OF TOWING MACHINE
- IF BATTERY IS DISCHARGED
- OTHER TROUBLE
- ACCORDING TO AMBIENT TEMPERATURE
- PROPER SELECTION OF FUEL, COOLANT AND LUBRICANTS
- STANDARD TIGHTENING TORQUES FOR BOLTS AND NUTS
- TORQUE LIST
- PERIODIC REPLACEMENT OF SAFETY CRITICAL PARTS
- SAFETY CRITICAL PARTS
- MAINTENANCE SCHEDULE CHART
- SERVICE PROCEDURE
- INITIAL 250 HOURS SERVICE (ONLY AFTER THE FIRST 250 HOURS)
- WHEN REQUIRED
- CHECK BEFORE STARTING
- EVERY 250 HOURS SERVICE
- EVERY 500 HOURS SERVICE
- EVERY 1000 HOURS SERVICE
- EVERY 2000 HOURS SERVICE
- EVERY 4000 HOURS SERVICE
Inside this manual
Real pages from this operation & maintenance manual (254 pages). Open the sample pages (PDF, 348 KB)
- Specifications, page 73: EXPLANATION OF COMPONENTS
- Controls and operation, page 139: 3. Set safety lever (6) for blade control lever (4) and ripper control
- Maintenance, page 196: SERVICE PROCEDURE
Other manuals for this machine
Save 10% on 2 manuals, 15% on 3 or more. Other manuals for the D375A-5 are listed below. Editions cover different serial number ranges: check the serial coverage and tick only the ones that match your machine.
Added to your cart. View cart
This is an operator's manual
Here's how it compares to the other manual types.
Service manual
Factory repair procedures and technical information such as specifications, troubleshooting, and wiring and hydraulic diagrams, for the models and systems the manual covers. See What's inside for its topics.
Operator's manual
Safe operation, controls, maintenance schedules, lubrication points, inspections, and basic checks. Repair procedures are in the service manual.
Parts manual
Illustrated diagrams with factory part numbers for identifying components and ordering parts. Repair procedures are in the service manual.
What it's used for
Factory manual for in-house farm and construction shop use. Straightforward, complete, and easy to follow. It contains the OEM information dealership service departments and parts counters use to diagnose problems, identify components, and perform maintenance or repairs correctly.
Service shops and owner/operators who repair their own equipment
Identifying correct parts and seeing how assemblies come apart and go back together
Keeping equipment running with less downtime
Factory manual, 254 pages
Quantity one is the manual described above.
Fast free USA shipping
Ships in 1 business day.
60-day returns
Free if the mistake is ours. A manual ordered in error must come back unopened in its shrink-wrap; you pay return shipping and a 20% restocking fee applies. Return policy
Other editions and similar models
Questions about model, serial number, engine coverage or contents? Contact us before purchasing and we'll help confirm it's the right manual. Please verify the manual type, machine model, serial number range and engine coverage before purchasing: manuals ordered in error carry a 20% restocking fee (return policy).