MidWestTechService, Parts and Operator's Manuals, in stock and ready to ship!
Fast free USA shippingShips in 1 business daySave 10% on 2 manuals, 15% on 3+

Hitachi ZX225USLC-6, ZX225USRLC-6 Excavator Workshop Service Manual

861 pages · Publication WDFB50-EN-00

$89.97
Fast free USA shippingShips in 1 business daySave 10% on 2 manuals, 15% on 3 or morePay by credit or debit card or with PayPal. No PayPal account needed.
Models
ZX225USLC-6, ZX225USRLC-6
Manual type
Workshop Service Manual
Pages
861
Publication
WDFB50-EN-00
Condition
Brand new
Hitachi ZX225USLC-6, ZX225USRLC-6 Excavator Workshop Service Manual, publication WDFB50-EN-00

What's inside

From the manual's own table of contents: 110 topics. See sample pages (PDF, 455 KB)

  • Assembling
  • Tightening Bolts and Nuts
  • Piping Joint
  • Painting
  • Bleeding Air from Hydraulic System
  • Bleeding Air from Fuel System
  • Defrosting Piping
  • Maintenance
  • Hydraulic Circuit Pressure Release Procedure
  • Pressure Release from Hydraulic Oil Tank
  • Pressure Release from Expansion Tank
  • Pump Device
  • Swing Motor
  • Travel Motor
  • Sprocket
  • Front Idler
  • Upper Roller
  • Lower Roller
  • Track
  • Pin and Bushing
  • Connection
  • Cylinder
  • Removal and Installation of Cab
  • Dimensions of Cab Glass
Show all 110 topics
  • Removal and Installation of Main Frame
  • Removal and Installation of Engine
  • Removal and Installation of Pump Device
  • Removal and Installation of Coupling
  • Disassembly of Pump Device
  • Assembly of Pump Device
  • Disassembly of Regulator
  • Assembly of Regulator
  • Disassembly of Solenoid Valve Unit
  • Assembly of Solenoid Valve Unit
  • Structure of Pilot Pump
  • Removal and Installation of Control Valve
  • Valve
  • Disassembly of Housing
  • Assembly of Housing
  • Disassembly of Control Valve (A Side)
  • Assembly of Control Valve (A Side)
  • Disassembly of Control Valve (B Side)
  • Assembly of Control Valve (B Side)
  • Disassembly of Blade Control Valve
  • Assembly of Blade Control Valve
  • Removal and Installation of Swing Device
  • Disassembly of Swing Reduction Gear
  • Assembly of Swing Reduction Gear
  • Disassembly of Swing Motor
  • Assembly of Swing Motor
  • Removal and Installation of Pilot Valve (Left)
  • (Right)
  • Removal and Installation of Blade Pilot Valve
  • Disassembly of Pilot Valves (Right and Left)
  • Assembly of Pilot Valves (Right and Left)
  • Disassembly of Travel Pilot Valve
  • Assembly of Travel Pilot Valve
  • Disassembly of Blade Pilot Valve
  • Assembly of Blade Pilot Valve
  • Solenoid Valve
  • Valve Unit
  • Assembly of Pilot Shut-Off Solenoid Valve
  • Structure of 5-Spool Solenoid Valve Unit
  • Structure of 2-Spool Solenoid Valve Unit
  • Structure of Signal Control Valve
  • Device (ZX225USLC-6)
  • Device (ZX225USRLC-6)
  • Removal and Installation of Swing Bearing
  • Disassembly of Swing Bearing
  • Assembly of Swing Bearing
  • Removal and Installation of Travel Device
  • Disassembly of Travel Device
  • Assembly of Travel Device
  • Disassembly of Travel Motor
  • Assembly of Travel Motor
  • Disassembly of Brake Valve
  • Assembly of Brake Valve
  • Precautions for Using Floating Seal
  • (Without Blade)
  • (With Blade)
  • Disassembly of Center Joint (without Blade)
  • Assembly of Center Joint (without Blade)
  • Replacement of Body and Spindle
  • Disassembly of Center Joint (with Blade)
  • Assembly of Center Joint (with Blade)
  • Removal and Installation of Track Adjuster
  • Disassembly of Front Idler
  • Assembly of Front Idler
  • Disassembly of Track Adjuster
  • Assembly of Track Adjuster
  • Removal and Installation of Upper Roller
  • Removal and Installation of Lower Roller
  • Disassembly of Lower Roller
  • Assembly of Lower Roller
  • Removal and Installation of Track
  • Removal and Installation of Blade Cylinder
  • Disassembly of Blade Cylinder
  • Assembly of Blade Cylinder
  • Removal and Installation of Front Attachment
  • Removal and Installation of Boom Cylinder
  • Removal and Installation of Arm Cylinder
  • Removal and Installation of Bucket Cylinder
  • Cylinders
  • Disassembly of Positioning Cylinder
  • Assembly of Positioning Cylinder
  • Valve for Boom Cylinder
  • Valve for Arm Cylinder
  • Valve for Positioning Cylinder
  • Cylinder (Right)
  • Cylinder (Left)

Inside this manual

Real pages from this workshop service manual (845 pages). Open the sample pages (PDF, 455 KB)

Sample pages from the Hitachi ZX225USLC-6, ZX225USRLC-6 Excavator Workshop Service Manual: Troubleshooting, Specifications, Diagram
  • Troubleshooting, page 114: Group 2 Undercarriage
  • Specifications, page 192: Group 2 Counterweight
  • Diagram, page 530: Group 14 Aftertreatment Device

Other manuals for this machine

Save 10% on 2 manuals, 15% on 3 or more. Other manuals for the ZX225USLC-6, ZX225USRLC-6 are listed below. Editions cover different serial number ranges: check the serial coverage and tick only the ones that match your machine.

This manual: Workshop Service Manual WDFB50-EN-00$89.97
Other manuals for the ZX225USLC-6, ZX225USRLC-6

Combined manuals

Details

This is a service manual

Here's how it compares to the other manual types.

This manual

Service manual

Factory repair procedures and technical information such as specifications, troubleshooting, and wiring and hydraulic diagrams, for the models and systems the manual covers. See What's inside for its topics.

Operator's manual

Safe operation, controls, maintenance schedules, lubrication points, inspections, and basic checks. Repair procedures are in the service manual.

Parts manual

Illustrated diagrams with factory part numbers for identifying components and ordering parts. Repair procedures are in the service manual.

Engine service manuals are sometimes sold separately, since certain machine models were offered with more than one engine option.

What it's used for

Factory manual for in-house farm and construction shop use. Straightforward, complete, and easy to follow. It contains the OEM information dealership service departments and parts counters use to diagnose problems, identify components, and perform maintenance or repairs correctly.

Service shops and owner/operators who repair their own equipment

Identifying correct parts and seeing how assemblies come apart and go back together

Keeping equipment running with less downtime

Factory manual, 861 pages

Quantity one is the manual described above.

Fast free USA shipping

Ships in 1 business day.

60-day returns

Free if the mistake is ours. A manual ordered in error must come back unopened in its shrink-wrap; you pay return shipping and a 20% restocking fee applies. Return policy

Binder not included

Manuals over about 300 pages may need a standard 3-ring binder, which you can buy locally to keep the pages organized for shop use.

Other editions and similar models

Questions about model, serial number, engine coverage or contents? Contact us before purchasing and we'll help confirm it's the right manual. Please verify the manual type, machine model, serial number range and engine coverage before purchasing: manuals ordered in error carry a 20% restocking fee (return policy).