MidWestTechService, Parts and Operator's Manuals, in stock and ready to ship!
Fast free USA shippingShips in 1 business daySave 10% on 2 manuals, 15% on 3+

Komatsu PC210-7K, PC210LC-7K, PC210NLC-7K, PC230NHD-7K, PC240LC-7K, PC240NLC-7K Hydraulic Excavator Operation & Maintenance Manual

364 pages · Publication UEAM001704

$69.91
Fast free USA shippingShips in 1 business daySave 10% on 2 manuals, 15% on 3 or morePay by credit or debit card or with PayPal. No PayPal account needed.
Models
PC210-7K, PC210LC-7K, PC210NLC-7K, PC230NHD-7K, PC240LC-7K, PC240NLC-7K
Serial coverage
PC210-7K K40001 and up, PC210LC-7K K40001 and up, PC210NLC-7K K40001 and up, PC230NHD-7K K40001 and up, PC240LC-7K K40001 and up, PC240NLC-7K K40001 and up
Manual type
Operation & Maintenance Manual
Pages
364
Publication
UEAM001704
Condition
Brand new
Komatsu PC210-7K, PC210LC-7K, PC210NLC-7K, PC230NHD-7K, PC240LC-7K, PC240NLC-7K Hydraulic Excavator Operation & Maintenance Manual, publication UEAM001704

What's inside

From the manual's own table of contents: 220 sections, 221 entries. See sample pages (PDF, 423 KB)

FOREWORD
SAFETY INFORMATION
VIBRATION
INTRODUCTION
DIRECTIONS OF MACHINE
PRODUCT INFORMATION
MACHINE SERIAL NUMBER PLATE AND ITS LOCATION
ENGINE SERIAL NUMBER PLATE AND ITS LOCATION
SERVICE METER LOCATION1 topic
  • TABLE TO ENTER SERIAL NO. AND DISTRIBUTOR
MACHINE SERIAL PLATE
POSITION FOR ATTACHING SAFETY LABELS
SAFETY LABELS
SAFETY MACHINE OPERATION
STARTING ENGINE
OPERATION
TRANSPORTATION
BATTERY
TOWING
LIFTING OBJECTS WITH BUCKET
SAFETY MAINTENANCE INFORMATION
GENERAL VIEW
GENERAL VIEW OF MACHINE
GENERAL VIEW CONTROLS AND GAUGES
EXPLANATION OF COMPONENTS
Show all 220 sections
MACHINE MONITOR
BASIC CHECK ITEMS
SWITCHES
CONTROL LEVERS, PEDALS
CEILING WINDOW
FRONT WINDOW
EMERGENCY EXIT FROM OPERATOR'S CAB
DOOR LOCK
CAP, COVER WITH LOCK
HOT AND COOL BOX
CAB RADIO
MAGAZINE BOX
ASHTRAY
HANDLING AIR CONDITIONER
CAR RADIO
FUSE
FUSIBLE LINK
CONTROLLER (COMPUTER)
TOOLBOX
GREASE GUN HOLDER
REFUELLING PUMP
HANDLING THE ACCUMULATOR
MACHINE OPERATIONS AND CONTROLS
BEFORE STARTING ENGINE
AFTER STARTING ENGINE
IN COLD AREAS (AUTOMATIC WARMING-UP OPERATION)
STOPPING THE ENGINE
CHECK AFTER SHUTTING OFF ENGINE
MACHINE OPERATION
STEERING THE MACHINE
SWINGING
WORK EQUIPMENT CONTROLS AND OPERATIONS
OPERATING WORKING MODE
PROHIBITED OPERATIONS
GENERAL OPERATION INFORMATION
TRAVELING ON SLOPES
ESCAPE FROM MUD
RECOMMENDED APPLICATIONS
REPLACEMENT AND INVERSION OF BUCKET
PARKING MACHINE
CHECK AFTER FINISHING WORK
LOCKING
TRANSPORTATION PROCEDURE
SPECIAL TRANSPORTATION INSTRUCTIONS FOR PC210NLC-7 AND PC230NHD-7
LOADING AND UNLOADING WITH TRAILER
LIFTING MACHINE
COLD WEATHER OPERATION
COLD WEATHER OPERATION INFORMATION
AFTER DAILY WORK COMPLETION
AFTER COLD WEATHER SEASON
LONG TERM STORAGE
BEFORE STORAGE
DURING STORAGE
AFTER STORAGE
TROUBLESHOOTING
AFTER RUNNING OUT OF FUEL
PHENOMENA THAT ARE NOT FAILURES
TOWING THE MACHINE
LIGHTWEIGHT TOWING HOOK
PRECAUTIONS ON PARTICULAR JOBSITES
DISCHARGED BATTERY
OTHER TROUBLE
MAINTENANCE INFORMATION
LUBRICANTS, COOLANT AND FILTERS
HANDLING OIL, FUEL, COOLANT, AND PERFORMING OIL CLINIC
EXPLANATION OF LUBRICATION CHART DECAL
ELECTRIC SYSTEM MAINTENANCE
HANDLING HYDRAULIC SYSTEM
WEAR PARTS LIST
USE OF FUEL, COOLANT AND LUBRICANTS ACCORDING TO AMBIENT TEMPERATURE
PROPER SELECTION OF FUEL, COOLANT AND LUBRICANTS
TIGHTENING TORQUE SPECIFICATIONS
TIGHTENING TORQUE LIST
PERIODIC REPLACEMENT OF SAFETY CRITICAL PARTS
SAFETY CRITICAL PARTS
MAINTENANCE SCHEDULE
MAINTENANCE SCHEDULE CHART
MAINTENANCE INTERVAL FOR HYDRAULIC BREAKER
MAINTENANCE PROCEDURE
INITIAL 250 HOURS MAINTENANCE (ONLY AFTER THE FIRST 250 HOURS)
WHEN REQUIRED
CHECK BEFORE STARTING
EVERY 100 HOURS MAINTENANCE
EVERY 250 HOURS MAINTENANCE
EVERY 500 HOURS MAINTENANCE
EVERY 1000 HOURS MAINTENANCE
EVERY 2000 HOURS MAINTENANCE
EVERY 4000 HOURS MAINTENENCE
EVERY 5000 HOURS MAINTENANCE
SPECIFICATIONS
EXPLANATION OF LIFTING CAPACITY CHART (PC210, PC210LC, PC210NLC-7K)
EXPLANATION OF LIFTING CAPACITY CHART (PC210, PC210LC, PC230NHD - 2 PIECE BOOM)
EXPLANATION OF LIFTING CAPACITY CHART (PC230NHD-7K)
EXPLANATION OF LIFTING CAPACITY CHART (PC240LC, PC240NLC-7K)
EXPLANATION OF LIFTING CAPACITY CHART (PC240LC,NLC-7K 2 PIECE BOOM)
GENERAL PRECAUTIONS
PRECAUTIONS RELATED TO SAFETY
PRECAUTIONS WHEN INSTALLING ATTACHMENTS
HANDLING BUCKET WITH HOOK
CHECKING FOR DAMAGE TO BUCKET WITH HOOK
MACHINES READY FOR ATTACHMENTS
HYDRAULIC CIRCUIT
ATTACHMENT MOUNTING/DISMOUNTING PROCEDURE
LONG-TERM STORAGE
ATTACHMENT GUIDE
COMBINATIONS OF WORK EQUIPMENT
SELECTION OF TRACK SHOES
SELECTION OF BUCKET TEETH
STANDARDS FOR SELECTING VERTICAL PIN TYPE AND HORIZONTAL PIN TYPE TEETH
HANDLING OF RUBBER PAD SHOE AND ROAD LINER
HANDLING TRAPEZOIDAL BUCKET
HANDLING EXTENSION ARM
HANDLING CLAMSHELL BUCKET
RECOMMENDED ATTACHMENT OPERATIONS
HYDRAULIC BREAKER
2-PC BOOM
FEATURES OF 2-PIECE BOOM & ARM
STRAIGHT BOOM PC210/240-7K
WORKING RANGE (PC 210 STRAIGHT BOOM)
TRANSPORTATION (PC 210 Straight Boom equipment)
WORKING RANGE (PC 240 STRAIGHT BOOM)
TRANSPORTATION (PC 240 Straight Boom equipment)
OPERATION INSTRUCTION FOR SUPER LONG FRONT BOOM AND ARM
TRANSPORT & STORAGE OF SUPER LONG FRONT MACHINE
WORKING RANGE OF SUPER LONG FRONT
LIFTING CAPACITY PC210 LC 15 m SUPER LONG FRONT
LIFTING CAPACITY PC210 NLC 15 m SUPER LONG FRONT
LIFTING CAPACITY PC240 LC 18 m SUPER LONG FRONT
LIFTING CAPACITY PC240 NLC 18 m SUPER LONG FRONT
MAINTENANCE
SPECIAL SERVICE REQUIREMENTS FOR SUPER LONG FRONT WORK EQUIPMENT
EVERY 50 HOURS SERVICE
EVERY 100 HOURS SERVICE
SAFETY RULES
IF ABNORMALITIES ARE FOUND
WORKING WEAR AND PERSONAL PROTECTIVE ITEMS
FIRE EXTINGUISHER AND FIRST AID KIT
SAFETY EQUIPMENT
KEEP MACHINE CLEAN
KEEP OPERATOR'S COMPARTMENT CLEAN
LEAVING OPERATOR'S SEAT WITH LOCK
HANDRAILS AND STEPS
MOUNTING AND DISMOUNTING
NO PERSONS ON ATTACHMENTS
BURN PREVENTION
FIRE PREVENTION AND EXPLOSION PREVENTION
ACTION IF FIRE OCCURS
WINDSHIELD WASHER FLUID
PREVENTION
ATTACHMENT INSTALLATION
ATTACHMENT COMBINATIONS
CAB WIDOW GLASSES
UNAUTHORIZED MODIFICATIONS
SAFETY AT JOBSITE
WORKING ON LOOSE GROUND
DISTANCE TO HIGH VOLTAGE CABLES
ENSURE GOOD VISIBILITY
VENTILATION FOR ENCLOSED AREA
SIGNALMAN'S SIGNAL AND SIGNS
ELECTROMAGNETIC INTERFERENCE
ASBESTOS DUST HAZARD PREVENTION
CHECKS BEFORE STARTING ENGINE
SAFETY RULES FOR STARTING ENGINE
STARTING ENGINE IN COLD WEATHER
CHECKS AFTER STARTING ENGINE
SAFETY RULES FOR CHANGING MACHINE DIRECTIONS
SAFETY RULES FOR TRAVELLING
TRAVELLING ON SLOPES
OPERATIONS ON SLOPES
OPERATIONS ON SNOW
SHIPPING THE MACHINE
BATTERY HAZARD PREVENTION
STARTING ENGINE WITH BOOSTER CABLES
SAFETY RULES FOR TOWING
SAFETY RULES FOR LIFTING OBJECTS
WARNING TAG
KEEP WORK PLACE CLEAN AND TIDY
APPOINT LEADER WHEN WORKING WITH OTHERS
STOP ENGINE BEFORE CARRYING OUT MAINTENANCE
TWO WORKERS FOR MAINTENANCE WHEN ENGINE IS RUNNING
PROPER TOOLS
ACCUMULATOR
PERSONNEL
ATTACHMENTS
WORK UNDER THE MACHINE
NOISE
WHEN USING HAMMER
WELDING WORKS
REMOVING BATTERY TERMINALS
SAFETY FIRST WHEN USING HIGH-PRESSURE GREASE TO ADJUST TRACK TENSION
DO NOT DISASSEMBLE RECOIL SPRINGS
SAFETY RULES FOR HIGH-PRESSURE OIL
SAFETY HANDLING HIGH-PRESSURE HOSES
WASTE MATERIALS
AIR CONDITIONER MAINTENANCE
COMPRESSED AIR

Inside this manual

Real pages from this operation & maintenance manual (364 pages). Open the sample pages (PDF, 422 KB)

Sample pages from the Komatsu PC210-7K, PC210LC-7K, PC210NLC-7K, PC230NHD-7K, PC240LC-7K and 1 more Hydraulic Excavator Operation & Maintenance Manual: Controls and operation, Maintenance, Specifications
  • Controls and operation, page 147: MACHINE OPERATIONS AND CONTROLS
  • Maintenance, page 207: MAINTENANCE INFORMATION
  • Specifications, page 287: SPECIFICATIONS

Other manuals for this machine

Save 10% on 2 manuals, 15% on 3 or more. Other manuals for the PC210-7K, PC240LC-7K are listed below. Editions cover different serial number ranges: check the serial coverage and tick only the ones that match your machine.

This manual: Operation & Maintenance Manual UEAM001704$69.91
Other manuals for the PC210-7K, PC240LC-7K

Service manuals

Details

This is an operator's manual

Here's how it compares to the other manual types.

Service manual

Factory repair procedures and technical information such as specifications, troubleshooting, and wiring and hydraulic diagrams, for the models and systems the manual covers. See What's inside for its topics.

This manual

Operator's manual

Safe operation, controls, maintenance schedules, lubrication points, inspections, and basic checks. Repair procedures are in the service manual.

Parts manual

Illustrated diagrams with factory part numbers for identifying components and ordering parts. Repair procedures are in the service manual.

What it's used for

Factory manual for in-house farm and construction shop use. Straightforward, complete, and easy to follow. It contains the OEM information dealership service departments and parts counters use to diagnose problems, identify components, and perform maintenance or repairs correctly.

Service shops and owner/operators who repair their own equipment

Identifying correct parts and seeing how assemblies come apart and go back together

Keeping equipment running with less downtime

Factory manual, 364 pages

Quantity one is the manual described above.

Fast free USA shipping

Ships in 1 business day.

60-day returns

Free if the mistake is ours. A manual ordered in error must come back unopened in its shrink-wrap; you pay return shipping and a 20% restocking fee applies. Return policy

Binder not included

Manuals over about 300 pages may need a standard 3-ring binder, which you can buy locally to keep the pages organized for shop use.

Other editions and similar models

Questions about model, serial number, engine coverage or contents? Contact us before purchasing and we'll help confirm it's the right manual. Please verify the manual type, machine model, serial number range and engine coverage before purchasing: manuals ordered in error carry a 20% restocking fee (return policy).