MidWestTechService, Parts and Operator's Manuals, in stock and ready to ship!
Fast free USA shippingShips in 1 business daySave 10% on 2 manuals, 15% on 3+

Komatsu PC210-7K, PC210LC-7K, PC210NLC-7K, PC230NHD-7K, PC240LC-7K, PC240NLC-7K Hydraulic Excavator Operation & Maintenance Manual

367 pages · Publication UEAM003900

$69.61
Fast free USA shippingShips in 1 business daySave 10% on 2 manuals, 15% on 3 or morePay by credit or debit card or with PayPal. No PayPal account needed.
Models
PC210-7K, PC210LC-7K, PC210NLC-7K, PC230NHD-7K, PC240LC-7K, PC240NLC-7K
Serial coverage
PC210-7K K41848 and up, PC210LC-7K K41848 and up, PC210NLC-7K K41848 and up, PC230NHD-7K K40181 and up, PC240LC-7K K40001 and up, PC240NLC-7K K40001 and up
Manual type
Operation & Maintenance Manual
Pages
367
Publication
UEAM003900
Condition
Brand new
Komatsu PC210-7K, PC210LC-7K, PC210NLC-7K, PC230NHD-7K, PC240LC-7K, PC240NLC-7K Hydraulic Excavator Operation & Maintenance Manual, publication UEAM003900

What's inside

From the manual's own table of contents: 99 sections, 164 entries. See sample pages (PDF, 410 KB)

FOREWORD
SAFETY INFORMATION1 topic
  • VIBRATION
INTRODUCTION2 topics
  • DIRECTIONS OF MACHINE
  • BREAKING-IN THE NEW MACHINE
PRODUCT INFORMATION5 topics
  • MACHINE SERIAL NUMBER PLATE AND ITS LOCATION
  • ENGINE SERIAL NUMBER PLATE AND ITS LOCATION
  • SERVICE METER LOCATION
  • TABLE TO ENTER SERIAL NO. AND DISTRIBUTOR
  • MACHINE SERIAL PLATE
POSITION FOR ATTACHING SAFETY LABELS1 topic
  • SAFETY LABELS
SAFETY MACHINE OPERATION6 topics
  • STARTING ENGINE
  • OPERATION
  • TRANSPORTATION
  • BATTERY
  • TOWING
  • LIFTING OBJECTS WITH BUCKET
SAFETY MAINTENANCE INFORMATION
GENERAL VIEW
GENERAL VIEW OF MACHINE
GENERAL VIEW CONTROLS AND GAUGES
EXPLANATION OF COMPONENTS
MACHINE MONITOR
BASIC CHECK ITEMS
SWITCHES
CONTROL LEVERS, PEDALS
CEILING WINDOW
FRONT WINDOW
EMERGENCY EXIT FROM OPERATOR'S CAB
DOOR LOCK
CAP, COVER WITH LOCK
HOT AND COOL BOX
CAB RADIO
MAGAZINE BOX
ASHTRAY
Show all 99 sections
HANDLING AIR CONDITIONER
CAR RADIO
FUSE
FUSIBLE LINK
CONTROLLER (COMPUTER)
TOOLBOX
GREASE GUN HOLDER
REFUELLING PUMP
HANDLING THE ACCUMULATOR
MACHINE OPERATIONS AND CONTROLS
BEFORE STARTING ENGINE
STARTING ENGINE
AFTER STARTING ENGINE
IN COLD AREAS (AUTOMATIC WARMING-UP OPERATION)
STOPPING THE ENGINE
CHECK AFTER SHUTTING OFF ENGINE
MACHINE OPERATION
STEERING THE MACHINE
SWINGING
WORK EQUIPMENT CONTROLS AND OPERATIONS
OPERATING WORKING MODE
PROHIBITED OPERATIONS
GENERAL OPERATION INFORMATION
TRAVELING ON SLOPES
ESCAPE FROM MUD
RECOMMENDED APPLICATIONS
REPLACEMENT AND INVERSION OF BUCKET3 topics
  • PARKING MACHINE
  • CHECK AFTER FINISHING WORK
  • LOCKING
TRANSPORTATION4 topics
  • TRANSPORTATION PROCEDURE
  • SPECIAL TRANSPORTATION INSTRUCTIONS FOR PC210NLC-7 AND PC230NHD-7
  • LOADING AND UNLOADING WITH TRAILER
  • LIFTING MACHINE
COLD WEATHER OPERATION3 topics
  • COLD WEATHER OPERATION INFORMATION
  • AFTER DAILY WORK COMPLETION
  • AFTER COLD WEATHER SEASON
LONG TERM STORAGE3 topics
  • BEFORE STORAGE
  • DURING STORAGE
  • AFTER STORAGE
TROUBLESHOOTING7 topics
  • AFTER RUNNING OUT OF FUEL
  • PHENOMENA THAT ARE NOT FAILURES
  • TOWING THE MACHINE
  • LIGHTWEIGHT TOWING HOOK
  • PRECAUTIONS ON PARTICULAR JOBSITES
  • DISCHARGED BATTERY
  • OTHER TROUBLE
MAINTENANCE INFORMATION
LUBRICANTS, COOLANT AND FILTERS4 topics
  • HANDLING OIL, FUEL, COOLANT, AND PERFORMING OIL CLINIC
  • EXPLANATION OF LUBRICATION CHART DECAL
  • ELECTRIC SYSTEM MAINTENANCE
  • HANDLING HYDRAULIC SYSTEM
WEAR PARTS LIST
USE OF FUEL, COOLANT AND LUBRICANTS ACCORDING TO AMBIENT TEMPERATURE1 topic
  • PROPER SELECTION OF FUEL, COOLANT AND LUBRICANTS
TIGHTENING TORQUE SPECIFICATIONS1 topic
  • TIGHTENING TORQUE LIST
PERIODIC REPLACEMENT OF SAFETY CRITICAL PARTS1 topic
  • SAFETY CRITICAL PARTS
MAINTENANCE SCHEDULE
MAINTENANCE SCHEDULE CHART
MAINTENANCE INTERVAL FOR HYDRAULIC BREAKER
MAINTENANCE PROCEDURE
EVERY 10 HOURS MAINTENANCE (FOR THE FIRST 50 HOURS)
INITIAL 250 HOURS MAINTENANCE (ONLY AFTER THE FIRST 250 HOURS)
WHEN REQUIRED
CHECK BEFORE STARTING
EVERY 100 HOURS MAINTENANCE
EVERY 250 HOURS MAINTENANCE
EVERY 500 HOURS MAINTENANCE
EVERY 1000 HOURS MAINTENANCE
EVERY 2000 HOURS MAINTENANCE
EVERY 4000 HOURS MAINTENENCE
EVERY 5000 HOURS MAINTENANCE
SPECIFICATIONS
EXPLANATION OF LIFTING CAPACITY CHART (PC210, PC210LC, PC210NLC-7K)
EXPLANATION OF LIFTING CAPACITY CHART (PC210, PC210LC, PC230NHD - 2 PIECE BOOM)
EXPLANATION OF LIFTING CAPACITY CHART (PC230NHD-7K)
EXPLANATION OF LIFTING CAPACITY CHART (PC240LC, PC240NLC-7K)
EXPLANATION OF LIFTING CAPACITY CHART (PC240LC,NLC-7K 2 PIECE BOOM)
GENERAL PRECAUTIONS
PRECAUTIONS RELATED TO SAFETY
PRECAUTIONS WHEN INSTALLING ATTACHMENTS
HANDLING BUCKET WITH HOOK
CHECKING FOR DAMAGE TO BUCKET WITH HOOK
MACHINES READY FOR ATTACHMENTS
HYDRAULIC CIRCUIT
ATTACHMENT MOUNTING/DISMOUNTING PROCEDURE
OPERATION
STORAGE
ATTACHMENT GUIDE
COMBINATIONS OF WORK EQUIPMENT7 topics
  • SELECTION OF TRACK SHOES
  • SELECTION OF BUCKET TEETH
  • STANDARDS FOR SELECTING VERTICAL PIN TYPE AND HORIZONTAL PIN TYPE TEETH
  • HANDLING OF RUBBER PAD SHOE AND ROAD LINER
  • HANDLING TRAPEZOIDAL BUCKET
  • HANDLING EXTENSION ARM
  • HANDLING CLAMSHELL BUCKET
RECOMMENDED ATTACHMENT OPERATIONS1 topic
  • HYDRAULIC BREAKER
BOOM1 topic
  • FEATURES OF 2-PIECE BOOM & ARM
STRAIGHT BOOM PC210/240-7K4 topics
  • WORKING RANGE (PC 210 STRAIGHT BOOM)
  • TRANSPORTATION (PC 210 Straight Boom equipment)
  • WORKING RANGE (PC 240 STRAIGHT BOOM)
  • TRANSPORTATION (PC 240 Straight Boom equipment)
OPERATION INSTRUCTION FOR SUPER LONG FRONT BOOM AND ARM7 topics
  • CONTROL LEVERS, PEDALS
  • TRANSPORT & STORAGE OF SUPER LONG FRONT MACHINE
  • WORKING RANGE OF SUPER LONG FRONT
  • LIFTING CAPACITY PC210 LC 15 m SUPER LONG FRONT
  • LIFTING CAPACITY PC210 NLC 15 m SUPER LONG FRONT
  • LIFTING CAPACITY PC240 LC 18 m SUPER LONG FRONT
  • LIFTING CAPACITY PC240 NLC 18 m SUPER LONG FRONT
MAINTENANCE3 topics
  • SPECIAL SERVICE REQUIREMENTS FOR SUPER LONG FRONT WORK EQUIPMENT
  • EVERY 50 HOURS SERVICE
  • EVERY 100 HOURS SERVICE

Inside this manual

Real pages from this operation & maintenance manual (367 pages). Open the sample pages (PDF, 409 KB)

Sample pages from the Komatsu PC210-7K, PC210LC-7K, PC210NLC-7K, PC230NHD-7K, PC240LC-7K and 1 more Hydraulic Excavator Operation & Maintenance Manual: Controls and operation, Maintenance, Specifications
  • Controls and operation, page 162: MACHINE OPERATIONS AND CONTROLS
  • Maintenance, page 262: MAINTENANCE
  • Specifications, page 282: SPECIFICATIONS

Other manuals for this machine

Save 10% on 2 manuals, 15% on 3 or more. Other manuals for the PC210-7K, PC240LC-7K are listed below. Editions cover different serial number ranges: check the serial coverage and tick only the ones that match your machine.

This manual: Operation & Maintenance Manual UEAM003900$69.61
Other manuals for the PC210-7K, PC240LC-7K

Service manuals

Details

This is an operator's manual

Here's how it compares to the other manual types.

Service manual

Factory repair procedures and technical information such as specifications, troubleshooting, and wiring and hydraulic diagrams, for the models and systems the manual covers. See What's inside for its topics.

This manual

Operator's manual

Safe operation, controls, maintenance schedules, lubrication points, inspections, and basic checks. Repair procedures are in the service manual.

Parts manual

Illustrated diagrams with factory part numbers for identifying components and ordering parts. Repair procedures are in the service manual.

What it's used for

Factory manual for in-house farm and construction shop use. Straightforward, complete, and easy to follow. It contains the OEM information dealership service departments and parts counters use to diagnose problems, identify components, and perform maintenance or repairs correctly.

Service shops and owner/operators who repair their own equipment

Identifying correct parts and seeing how assemblies come apart and go back together

Keeping equipment running with less downtime

Factory manual, 367 pages

Quantity one is the manual described above.

Fast free USA shipping

Ships in 1 business day.

60-day returns

Free if the mistake is ours. A manual ordered in error must come back unopened in its shrink-wrap; you pay return shipping and a 20% restocking fee applies. Return policy

Binder not included

Manuals over about 300 pages may need a standard 3-ring binder, which you can buy locally to keep the pages organized for shop use.

Other editions and similar models

Questions about model, serial number, engine coverage or contents? Contact us before purchasing and we'll help confirm it's the right manual. Please verify the manual type, machine model, serial number range and engine coverage before purchasing: manuals ordered in error carry a 20% restocking fee (return policy).