MidWestTechService, Parts and Operator's Manuals, in stock and ready to ship!
Fast free USA shippingShips in 1 business daySave 10% on 2 manuals, 15% on 3+

Komatsu PC400LC-6, PC400HD-6 Hydraulic Excavator Operation & Maintenance Manual

273 pages · Publication CEAM4006C1

$69.91
Fast free USA shippingShips in 1 business daySave 10% on 2 manuals, 15% on 3 or morePay by credit or debit card or with PayPal. No PayPal account needed.
Models
PC400LC-6, PC400HD-6
Serial coverage
PC400LC-6 A80001 and up, PC400HD-6 A80001 and up
Manual type
Operation & Maintenance Manual
Pages
273
Publication
CEAM4006C1
Condition
Brand new
Komatsu PC400LC-6, PC400HD-6 Hydraulic Excavator Operation & Maintenance Manual, publication CEAM4006C1

What's inside

From the manual's own table of contents: 28 sections, 243 entries. See sample pages (PDF, 384 KB)

FORWARD
SAFETY INFORMATION
INTRODUCTION3 topics
  • INTENDED USE
  • FEATURES
  • BREAKING IN A NEW MACHINE
LOCATION OF PLATES, TABLE TO ENTER SERIAL NO. AND DISTRIBUTOR3 topics
  • MACHINE SERIAL NO. PLATE POSITION
  • ENGINE SERIAL NO. PLATE POSITION
  • TABLE TO ENTER SERIAL NO. AND DISTRIBUTOR
GENERAL PRECAUTIONS
PRECAUTIONS DURING OPERATION8 topics
  • BEFORE STARTING ENGINE
  • OPERATINGMACHINE
  • TRANSPORTATION
  • BATTERY
  • 7.5TOWlNG
  • BUCKET WITH HOOK
    • GENERAL PRECAUTIONS
    • PRECAUTIONS FOR LIFTING OPERA T ;dN’
PRECAUTIONS FOR MAINTENANCE2 topics
  • BEFORE CARRYING OUT MAINTENANCE
  • DURING MAINTENANCE
POSITION FOR ATTACHING SAFETY LABELS
GENERALVIEW2 topics
  • GENERAL VIEW OF MACHINE
  • GENERAL VIEW OF CONTROLS AND GAUGES
EXPLANATION OF COMPONENTS32 topics
  • MACHINEMONITOR
    • A. BASICCHECKITEMS
    • B. CAUTION ITEMS
    • C. EMERGENCY STOP ITEMS
    • D. METER DISPLAY PORTION
    • E. SWITCHES
  • SWITCHES
  • CEILING WINDOW
  • FRONTWINDOW
  • DOORLOCK
  • CAP, COVER WITH LOCK
    • METHOD OF OPENING AND CLOSING CAP WITH LOCK (For the fuel tank filler port)
    • METHOD OF OPENING AND CLOSING COVER WITH LOCK (For the cover with lock)
  • HOT/COOLBOX
  • LUGGAGEBOX
  • ASHTRAY
  • 11 .ll HANDLING AIR CONDITIONER
  • 11 .l 1 .l GENERAL LOCATIONS ON CONTROL PANEL
    • PRECAUTIONS WHEN USING AIR CONDITIONER
  • CARRADIO
    • EXPLANATION OF COMPONENTS
    • LOCATION AND FUNCTION OF CONTROLS
    • METHOD OF OPERATION
    • PRECAUTIONS WHEN USING
    • SPECIFICATIONS
  • FUSE
  • FUSIBLELINK
  • CONTROLLERS
  • TOOLBOX
  • GREASE GUN HOLDER
  • HANDLING ACCUMULATOR
    • METHOD OF RELEASING PRESSURE IN CONTROL
12.OPERATlON38 topics
  • CHECK BEFORE STARTING
    • WALK AROUND CHECK
    • CHECK BEFORE STARTING
    • ADJUST BEFORE OPERATION
    • OPERATIONS AND CHECKS BEFORE STARTING ENGINE
  • STARTINGENGINE
    • NORMAL STARTING
    • STARTING IN COLD WEATHER
  • OPERATIONS AND CHECKS AFTER STARTING ENGINE
    • WHEN NORMAL
    • IN COLD AREAS
  • MOVING MACHINE OFF
    • MOVING MACHINE FORWARD
    • MOVING MACHINE BACKWARD
  • STEERINGMACHINE
    • STEERING (CHANGING DIRECTION)
  • STOPPING MACHINE
  • SWINGING
  • OPERATION OF WORK EQUIPMENT
  • WORKING MODE SELECTION
  • PROHIBITIONS FOR OPERATION
  • PRECAUTIONS FOR OPERATION
  • PRECAUTIONS WHEN TRAVELING UP OR DOWN HILLS
  • HOW TO ESCAPE FROM MUD
    • WHEN ONE SIDE IS STUCK
    • WHEN BOTH SIDES ARE STUCK
  • WORK POSSIBLE USING HYDRAULIC EXCAVATOR
    • BACKHOE WORK
    • SHOVEL WORK
    • DITCHING WORK
    • LOADING WORK
  • REPLACEMENT AND INVERSION OF BUCKET
    • REPLACEMENT
    • INVERSION
  • PARKING MACHINE
  • CHECK AFTER FINISHING WORK
  • STOPPING ENGINE
  • CHECK AFTER STOPPING ENGINE
TRANSPORTATION4 topics
  • LOADING AND UNLOADING MACHINE
  • PRECAUTIONS FOR LOADING
    • (PC400HD-6 AVANCE)
  • PRECAUTIONS FOR TRANSPORTATION
COLD WEATHER OPERATION6 topics
  • PRECAUTIONS FOR LOW TEMPERATURE
  • l FUEL AND LUBRICANTS
    • COOLANT
    • BATTERY
  • PRECAUTIONS AFTER COMPLETION OF WORK
  • AFTER COLD WEATHER
LONG-TERM STORAGE4 topics
  • BEFORE STORAGE
  • DURING STORAGE
  • AFTERSTORAGE
  • STARTING MACHINE AFTER LONG-TERM STORAGE
TROUBLESHOOTING11 topics
  • PHENOMENA THAT ARE NOT FAILURES
  • METHOD OF TOWING MACHINE
  • METHOD FOR USING LIGHT-WEIGHT TOWING HOLE
  • PRECAUTIONS ON PARTICULAR JOB SITES
  • IF BATTERY IS DISCHARGED
    • STARTING ENGINE WITH BOOSTER CABLE
  • OTHER TROUBLE
    • ELECTRICAL SYSTEM
    • CHASSIS
    • ENGINE
    • ELECTRONIC CONTROL SYSTEM
OUTLINES OF SERVICE9 topics
  • OUTLINE OF OIL, FUEL, COOLANT
    • FUEL
    • COOLANT
    • GREASE
    • STORING OIL AND FUEL
    • FILTERS
  • OUTLINE OF ELECTRIC SYSTEM
  • OUTLINE OF HYDRAULIC SYSTEM
  • OUTLINE OF FUEL SYSTEM
USE OF FUEL, COOLANT AND LUBRICANTS ACCORDING TO AMBIENT TEMPERATURE
STANDARD TIGHTENING TORQUES FOR BOLTS AND NUTS2 topics
  • 21 .l INTRODUCTION OF NECESSARY TOOLS
  • TORQUELIST
PERIODIC REPLACEMENT OF SAFETY CRITICAL PARTS
MAINTENANCE SCHEDULE CHART1 topic
  • MAINTENANCE INTERVAL WHEN USING HYDRAULIC BREAKER
SERVICE PROCEDURE62 topics
  • WHEN REQUIRED
  • l CHECK, CLEAN AND REPLACE AIR CLEANER ELEMENT
    • CHECK AND TIGHTEN TRACK SHOE BOLTS
    • CHECK AND ADJUST TRACK TENSION
    • CHECK ALTERNATOR
    • CHECK STARTER MOTOR
    • INSTALLATION OF BUCKET TEETH
    • ADJUST BUCKET CLEARANCE
    • CHECK WINDOW WASHER FLUID LEVEL, ADD FLUID
    • CHECK AND ADJUST AIR CONDITIONER
  • lO REPLACE ATTACHMENT RETURN LINE FILTER (OPTION)
  • ll CLEAN INLINE FILTER
    • CHECK COOLANT LEVEL, ADD COOLANT
    • CHECK OIL LEVEL IN ENGINE OIL PAN, ADD OIL
    • CHECK FUEL LEVEL, ADD FUEL
    • CHECK OIL LEVEL IN HYDRAULIC TANK, ADD OIL
    • CHECK AIR CLEANER FOR CLOGGING
    • CHECK ELECTRIC WIRING
    • DRAIN WATER FROM THE FUEL-WATER SEPARATOR
  • EVERY 50 HOURS SERVICE
    • LUBRICATING
  • EVERY 100 HOURS SERVICE
    • LUBRICATING
    • CHECK OIL LEVEL IN SWING MACHINERY CASE, ADD
    • DRAIN WATER AND SEDIMENT FROM FUEL TANK
  • EVERY 250 HOURS SERVICE
    • CHECK OIL LEVEL IN FINAL DRIVE CASE, ADD OIL
    • CHECK LEVEL OF BATTERY ELECTROLYTE
    • CHECK AIR INTAKE SYSTEM
    • CHANGE OIL IN ENGINE OIL PAN, REPLACE ENGINE OIL
    • REPLACE HYDRAULIC FILTER ELEMENT
    • LUBRICATE SWING CIRCLE (3 POINTS)
    • BELTS, GENERAL
    • CHECK ALTERNATOR AND FAN BELT TENSION, ADJUST
    • AIR CONDITIONER COMPRESSOR BELT TENSION
    • COOLANT ADDITIVE CONCENTRATION
    • REPLACE FUEL FILTER CARTRIDGES
    • REPLACE CORROSION RESISTOR CARTRIDGE
  • EVERY 500 HOURS SERVICE
    • CHECK SWING PINION GREASE LEVEL, ADD GREASE
    • REPLACE HYDRAULIC TANK BREATHER ELEMENT
  • EVERY 1000 HOURS SERVICE
    • CHANGE OIL IN SWING MACHINERY CASE
    • CHECK OIL LEVEL IN DAMPER CASE, ADD OIL
  • EVERY 1500 HOURS SERVICE
    • CHECK ALL TIGHTENING PARTS OF TURBOCHARGER
    • CHECK HOSES, REPLACE
    • STEAM CLEAN ENGINE
    • CHECK ENGINE VALVE CLEARANCE, ADJUST
  • EVERY 2000 HOURS SERVICE
    • CHANGE OIL IN FINAL DRIVE CASE
    • CHANGE OIL IN HYDRAULIC TANK, CLEAN STRAINER
    • CHECK ALTERNATOR, STARTING MOTOR
  • EVERY 4000 HOURS SERVICE
    • CLEAN INSIDE OF COOLING SYSTEM
    • CHECK WATER PUMP
  • EVERY 6000 HOURS SERVICE
  • l CHECK PLAY OF TURBOCHARGER ROTOR
    • CHECK VIBRATION DAMPER
    • CHECK FAN HUB
    • CHECK ENGINE IDLER PULLEY
    • CHECK FAN PULLEY AND TENSION PULLEY
25.SPEClFlCATlONS
GENERAL PRECAUTIONS2 topics
  • PRECAUTIONS RELATED TO SAFETY
  • PRECAUTIONS WHEN INSTALLING ATTACHMENTS
HANDLING BUCKET WITH HOOK3 topics
  • CHECK FOR DAMAGE TO BUCKET WITH HOOK
  • PROHIBITED OPERATIONS
  • PRECAUTIONS DURING OPERATIONS
Show all 28 sections
USINGSEATBELT3 topics
  • SEATBELT
  • l FASTEN THE BELT AND REMOVE IT
    • ADJUST THE BELT LENGTH
HANDLING CAB HEATER2 topics
  • EXPLANATION OF COMPONENTS
  • PREPARING CAB HEATER
HANDLING LARGE CAPACITY CAB HEATER10 topics
  • CONNECTING HYDRAULIC CIRCUIT
  • PROCEDURE FOR REMOVAL AND INSTALLATION OF ATTACHMENT
  • OPERATION
  • LONG-TERM STORAGE
  • SPECIFICATIONS
  • SPECIFICATION, USE
  • SPECIFICATION,USE
  • ATTACHMENT INSTALLATION COMBINATION TABLE
  • SELECTION OF TRACK SHOES
  • BUCKET SELECTION
EXTENDING MACHINE SERVICE LIFE8 topics
  • HYDRAULIC BREAKER
  • CRUSHER
  • GRAPPLE
  • BUCKET WITH THUMB GRAPPLE
  • ROTATING GRAPPLE
  • SHEAR
  • HYDRAULIC PILE DRIVER
  • HYDRAULIC EXCAVATOR WITH MULTI-PURPOSE CRANE

Inside this manual

Real pages from this operation & maintenance manual (273 pages). Open the sample pages (PDF, 383 KB)

Sample pages from the Komatsu PC400LC-6, PC400HD-6 Hydraulic Excavator Operation & Maintenance Manual: Controls and operation, Maintenance, Specifications
  • Controls and operation, page 69: ATTACHMENT
  • Maintenance, page 213: Fill the new filters with clean diesel fuel. Then, apply a thin coat of
  • Specifications, page 257: OPTIONS, ATTACHMENTS

Other manuals for this machine

Save 10% on 2 manuals, 15% on 3 or more. Other manuals for the PC400LC-6, PC400HD-6 are listed below. Editions cover different serial number ranges: check the serial coverage and tick only the ones that match your machine.

This manual: Operation & Maintenance Manual CEAM4006C1$69.91
Other manuals for the PC400LC-6, PC400HD-6

Service manuals

Details

This is an operator's manual

Here's how it compares to the other manual types.

Service manual

Factory repair procedures and technical information such as specifications, troubleshooting, and wiring and hydraulic diagrams, for the models and systems the manual covers. See What's inside for its topics.

This manual

Operator's manual

Safe operation, controls, maintenance schedules, lubrication points, inspections, and basic checks. Repair procedures are in the service manual.

Parts manual

Illustrated diagrams with factory part numbers for identifying components and ordering parts. Repair procedures are in the service manual.

What it's used for

Factory manual for in-house farm and construction shop use. Straightforward, complete, and easy to follow. It contains the OEM information dealership service departments and parts counters use to diagnose problems, identify components, and perform maintenance or repairs correctly.

Service shops and owner/operators who repair their own equipment

Identifying correct parts and seeing how assemblies come apart and go back together

Keeping equipment running with less downtime

Factory manual, 273 pages

Quantity one is the manual described above.

Fast free USA shipping

Ships in 1 business day.

60-day returns

Free if the mistake is ours. A manual ordered in error must come back unopened in its shrink-wrap; you pay return shipping and a 20% restocking fee applies. Return policy

Other editions and similar models

Questions about model, serial number, engine coverage or contents? Contact us before purchasing and we'll help confirm it's the right manual. Please verify the manual type, machine model, serial number range and engine coverage before purchasing: manuals ordered in error carry a 20% restocking fee (return policy).